Our dyeing and washing plant in Cambodia

Two production buildings, 8,000 m² in total, with our own boilers, backup power and water treatment, running since May 2023 with 100 workers.

On site

Everything an order needs sits inside one plant, from lab dips to the final shade check. Backup generators keep machines running when the grid drops.

  • 2 production buildings, 8,000 m² in total
  • 1 water treatment system, with treated water recycled for reuse
  • Dyeing machines from 2 lb samples to 800 lb bulk
  • 2 backup generators
  • 2 boilers
  • Fingerprint attendance system for HR control
  • Safe drinking water for staff
  • Clean, well-ventilated workplace

Plan a dyeing lot

Enter a garment and quantity to see roughly which of our machines the lot would run on.

    Rough planning estimate. The real load per machine depends on fabric, shade depth and process, and we confirm it from your sample.

    Equipment list

    With bulk machines spread from 20 to 800 lb, each lot runs on a machine close to its weight instead of a half-empty large one.

    Each machine is listed at 8 operating hours a day. Together the plant is set up for 750,000 pieces a month.

    Machines on site, by type and capacity
    EquipmentMachinesShare of dyeing machinesDaily hours
    Dyeing machines, by lot size
    800 lb28
    600 lb228
    500 lb28
    400 lb88
    300 lb68
    200 lb58
    100 lb48
    75 lb38
    25 lb28
    20 lb18
    2, 5 and 8 lb (samples)28
    Washing, drying and inspection
    Washing machines558
    Dryers388
    Lightboxes2–

    Photos from the production building. Select a photo to enlarge it.

    Plan a run on our lines

    Tell us the lot sizes and monthly volume you need, and we will match them to our machines.